ZONGULDAK REHABILITATION OF DEVREK RIVER
LOCATION | |
Devrek-Zonguldak-Turkiye | |
CLIENT | |
General Directorate of State Hydraulic Works ( DSI ) | |
SERVICES | |
EPC Contract – in conformity with FIDIC Yellow Book | |
For the aim of sheltering the city center from a possible flood, | |
proper structures, bridges and walls were constructed. | |
DESCRIPTION | |
Retaining Walls R/C | L= 1660 m H= 7 m. |
R/C Piles | L= 20.500 m. D= 80 cm. |
Embankment Filling | 178.000 m3 |
River Bed Excavation | 135.000 m3 |
Reinforced Concrete | 42.120 m3 |
Bridge With Prestressed Beam | Unit 1 L= 52 m. |
Category:
FLOOD CONTROL STRUCTURES