SANLIURFA WATER SUPPLY PROJECT DESIGN & CONSTRUCTION
| LOCATION | |
| Sanliurfa – Turkiye | |
| CLIENT | |
| The European Comission Turkey Delegation | |
| SERVICES | |
| EPC Contract in conformity with FIDIC Yellow Book | |
| Turnkey Contract | |
| DESCRIPTION | |
| Pipe Lines | L= 33.000 m D= 1800 mm- 500 mm Steel Pipes |
| Reservoirs | Unit 3 V= 20.500 m3 |
| Unit 3 V= 10.000 m3 | |
| Unit 1 V= 22.500 m3 | |
| Pump Stations | Unit 3 ( Unit 7 pumps x Q=755 lt/sec) |
| Electrical Works | Transmission Lines 34,5 kv. , Motors, Scada, |
| Other Works | Braker Panels, Control-Measuring Systems. Valves, Air Valves, Drainage Valves etc. |
Category:
WATER SUPPLY SYSTEMS
English
Türkçe