ANTALYA WATER SUPPLY PROJECT, MAIN TRANSMISSION PIPE LINES RESERVOIRS AND PUMP STATIONS (DSİ)
LOCATION | |
Antalya-Turkiye | |
CLIENT | |
General Directorate of State Hydraulic Works ( DSİ ) | |
SERVICES | |
EPC Contract | |
DESCRIPTION | |
Pipe Lines | L= 51.500 m. D= 1400 mm- 250 mm Steel Pipes |
Reservoirs | Unit 2 V= 20.000 m3 |
Unit 1 V= 10.000 m3 | |
Unit 2 V= 5.000 m3 | |
Pump Stations | Unit 1 ( Unit 4 pumps x Q= 360 lt/sec) |
Electrical Works | Transmission Lines 34,5 kv. , Motors, |
Braker Panels, Control-Measuring Systems. | |
Concrete Works | 21.549 m3 |
Other Works | Valves, Air Valves, Drainage Valves etc. |
Category:
WATER SUPPLY SYSTEMS